Reseda Lot Gets 48 Affordable Apartments
Permits are issued for the four-story building at 6908 Baird Ave., which will have no on-site parking.
Updated on Nov. 17, 2026 in Construction

Live Poll
Would you support more affordable housing apartments being built in your neighborhood?
Reseda renters and neighbors on Baird Avenue will soon have a four-story building with 48 apartments on a vacant lot at 6908 Baird Ave. The Los Angeles Department of Building and Safety has issued permits for the affordable housing project, which will include no on-site parking.
Why it matters
Reseda's empty lots are getting a new use, and the project adds 47 low- and moderate-income units to a Valley neighborhood where affordable housing is in short supply. Building without on-site parking means its residents will be relying on transit, bikes and the street rather than a garage, which is a question every nearby block will feel.
The Department of Building and Safety permits cover a 48-unit building, with 47 units reserved for low- and moderate-income households and one mandatory manager's unit. The stub does not say when construction will begin or how long it will take.
The players
Los Angeles Department of Building and Safety
The city agency that issued the permits for the affordable housing project at 6908 Baird Ave.
GA Engineering
The firm designing the four-story, 48-unit affordable housing building.
The details
The site at 6908 Baird Ave. in Reseda is currently an empty lot that was once slated for a small lot subdivision that never got built. Approvals secured in 2023 allowed the project to use density bonus incentives and the streamlining provisions of Executive Directive 1, and GA Engineering is designing the four-story building. The city's permits were issued on November 17, 2026.
Timeline
2023: Project approvals were secured.
November 17, 2026: The Los Angeles Department of Building and Safety issued the permits.
The Southland View
This project follows the density bonus and streamlining pathway that Los Angeles has used to fast-track affordable housing on infill lots. It is one more Valley example of a stalled subdivision being replaced by rental units rather than single-family homes.
If you live near Baird Avenue in Reseda, expect construction traffic and crews once work begins, and plan around the lack of on-site parking for the new building's residents. Renters looking for affordable units can check the city's application portal to see whether listings open up when the building is ready.
The takeaway
The Reseda project shows how density bonus and streamlining rules are turning stalled lots into affordable homes faster. Watch for construction notices on Baird Avenue and check the city's affordable housing portal when units are ready to lease.
Further reading
For more on how new building is changing the city, see our Construction coverage.
More information
Check availability and apply through the Los Angeles affordable housing application portal.
Source note: This article includes information reported by Urbanize LA.
Live Poll
Would you support more affordable housing apartments being built in your neighborhood?


